{"id":1321,"date":"2018-02-26T12:51:37","date_gmt":"2018-02-26T12:51:37","guid":{"rendered":"http:\/\/www.constructionplantworld.com\/news\/?p=1321"},"modified":"2018-02-26T12:51:37","modified_gmt":"2018-02-26T12:51:37","slug":"booboo-plant-hire-spreads-sunshine-with-solar-trailer-lighting-fleet","status":"publish","type":"post","link":"https:\/\/www.constructionplantworld.com\/news\/2018\/02\/booboo-plant-hire-spreads-sunshine-with-solar-trailer-lighting-fleet\/","title":{"rendered":"BooBoo Plant Hire spreads sunshine with Solar Trailer Lighting Fleet"},"content":{"rendered":"<p>BooBoo Plant Hire is expanding its demolition and construction plant hire business with an order of ten ProLight solar lighting towers from Prolectric Limited. The order adds a temporary lighting option with no emissions, noise or fumes for BooBoo\u2019s customers and provides more options for contractors to benefit from the rapidly-expanding fleet of Prolectric solar lighting.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-1323 size-medium\" src=\"http:\/\/www.constructionplantworld.com\/news\/wp-content\/uploads\/2018\/02\/ABC-Filton1-3-277x300.jpg\" alt=\"\" width=\"277\" height=\"300\" srcset=\"https:\/\/www.constructionplantworld.com\/news\/wp-content\/uploads\/2018\/02\/ABC-Filton1-3-277x300.jpg 277w, https:\/\/www.constructionplantworld.com\/news\/wp-content\/uploads\/2018\/02\/ABC-Filton1-3.jpg 500w\" sizes=\"auto, (max-width: 277px) 100vw, 277px\" \/>The order means BooBoo Plant Hire can now provide environmentally-responsible, smart, clean and low-maintenance temporary lighting as an alternative to conventional diesel-powered lights anywhere in the UK. The units can be delivered to site to provide bright, reliable lighting for demolition projects, urban infrastructure contracts and welfare compounds.<\/p>\n<p>Taking delivery of the first three ProLight solar lighting towers from Prolectric at BooBoo\u2019s headquarters in Kings Langley, Hertfordshire, BooBoo Plant Hire\u2019s Director Terry Guilder said:<\/p>\n<p>\u201cSince first coming across Prolectric, we have been thoroughly impressed with the ProLight and eager to add it to our plant hire portfolio as quickly as possible. We have a strong London base, and we have seen an increased demand for solar-powered equipment from contractors needing to meet more stringent emissions regulations in the capital as well as in other major cities.<\/p>\n<p>Not only is the ProLight an attractive option for the environment with no air pollution or carbon emissions, but we are equally excited by the added-value and reliability it will offer to our customers. Especially for our demolition and urban construction projects, using the ProLight means no noise or fumes and therefore our customers can work for longer and with less nuisance when close to residential areas or in busy urban environments.\u201d<\/p>\n<p>Chris Williams, managing director of Prolectric said: \u201cWe are delighted that BooBoo Plant Hire has committed to providing sustainable and low-maintenance temporary lighting for its customers.<\/p>\n<p>\u201cThere are now 100s of Prolectric temporary lights in use across the UK making a worthwhile contribution to reducing construction industry carbon emissions. The rapidly-growing popularity is a ringing endorsement of this revolutionary \u201cuse and forget\u201d technology and the fact that contractors can rely on the technology to operate all year round even when daylight hours are limited.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-1324\" src=\"http:\/\/www.constructionplantworld.com\/news\/wp-content\/uploads\/2018\/02\/golfclubdrive.jpg\" alt=\"\" width=\"650\" height=\"264\" srcset=\"https:\/\/www.constructionplantworld.com\/news\/wp-content\/uploads\/2018\/02\/golfclubdrive.jpg 650w, https:\/\/www.constructionplantworld.com\/news\/wp-content\/uploads\/2018\/02\/golfclubdrive-300x122.jpg 300w\" sizes=\"auto, (max-width: 650px) 100vw, 650px\" \/>Solar lighting specialist manufacturer Prolectric launched the ProLight last year as the first temporary solar lighting tower that can operate reliably even on winter days with 16 hours of darkness. The ProLight comprises a specially-developed trailer-mounted unit with heavy-duty, deep-cycle batteries, an array of four or three high powered solar panels, a 7.5m telescopic mast and four LED lights a minimum Lux level of 20 and 10,000 to 40,000 lumens output.<\/p>\n<p>The Prolectric ProLight\u2019s digital remote monitoring and control function enables on\/off settings to be automatically adjusted to suit the light conditions and its performance can be tracked and reported. Prolectric can also provide users with an easy calculator tool to help contractors to demonstrate the light\u2019s carbon emissions and manpower cost savings, easily justifying their use against diesel alternatives.<\/p>\n<p>&nbsp;<\/p>\n<p>For more information on BooBoo Plant Hire please visit <a href=\"http:\/\/www.boobooplanthire.co.uk\/\" target=\"_blank\" rel=\"noopener\">their website<\/a><\/p>\n<p>To see the full range of solar and wind power technologies offered by Prolectric click <a href=\"http:\/\/www.prolectric.co.uk\/\" target=\"_blank\" rel=\"noopener\">here<\/a>.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>BooBoo Plant Hire is expanding its demolition and construction plant hire business with an order of ten ProLight solar lighting <\/p>\n<a class=\"btn-sub-green l-blog-post-readmore\" href=\"https:\/\/www.constructionplantworld.com\/news\/2018\/02\/booboo-plant-hire-spreads-sunshine-with-solar-trailer-lighting-fleet\/\" title=\"Read more\">Read more<\/a>","protected":false},"author":2,"featured_media":1322,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[],"class_list":["post-1321","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-plant-news"],"_links":{"self":[{"href":"https:\/\/www.constructionplantworld.com\/news\/wp-json\/wp\/v2\/posts\/1321","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionplantworld.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionplantworld.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionplantworld.com\/news\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionplantworld.com\/news\/wp-json\/wp\/v2\/comments?post=1321"}],"version-history":[{"count":1,"href":"https:\/\/www.constructionplantworld.com\/news\/wp-json\/wp\/v2\/posts\/1321\/revisions"}],"predecessor-version":[{"id":1325,"href":"https:\/\/www.constructionplantworld.com\/news\/wp-json\/wp\/v2\/posts\/1321\/revisions\/1325"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionplantworld.com\/news\/wp-json\/wp\/v2\/media\/1322"}],"wp:attachment":[{"href":"https:\/\/www.constructionplantworld.com\/news\/wp-json\/wp\/v2\/media?parent=1321"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionplantworld.com\/news\/wp-json\/wp\/v2\/categories?post=1321"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionplantworld.com\/news\/wp-json\/wp\/v2\/tags?post=1321"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}